articles

The New Midway Chair 5 is now open to public at Bear Mountain Resort

Midway Lift Debut in mid-December

January 2, 2025

As Southern California’s home for peak alpine adventure, Big Bear Mountain Resort (BBMR) is famous for pushing progression on and off the slopes. For the winter 24/25 season, the progression continues at Bear Mountain with the all-new Midway lift, which officially opened on Thursday, December 19, 2024. The high-speed 6-seat lift designed by Leitner-Poma will replace chairs 2 and 5 in the central base area and provide better uphill capacity and easier access to the mid-mountain progression terrain so guests can enjoy shorter lift lines and more time on the slopes.



Midway Lift Stats


  • Manufacturer: Leitner-Poma
  • Length: 2,494 feet
  • Carriers: 50
  • Uphill capacity: 1,000 ft/minute; 3,200 people/hr
  • Ride time: 2.5 minutes
  • Features: Base terminal loading conveyor
  • Cost: $10.2 million